Home > Installation Instruction For Luigi LED Remote Control Brass Shower Set
Installation Instructions










Attention

1. Open packages, check all the goods whether everything is ok.

2. Check the size of the connector and the thread size of the water pipes connector in the wall.

3. Clean the water pipes before installing them.

4. At least 2 water electricians to install the showerhead.

5. Pay attention to the water temperature, not over 70 degree.

6. Water pressure: 0.05 MPA - 0.5 MPA.

7. Adapter is 100-265 V to 12 V, insurance device rated currently less than 30 MA


Care & Maintenance

Keep the surface clean, regular cleaning.

Using water clean it, using a cotton cloth to wipe dry.

Shower-Head Installation



1. According to the dimensions and shape of the mounting bracket, determine the bracket location to be installed in the ceiling.

2. According to the 8 mounting holes on the mounting bracket, use Electric drill to make the mounting holes.

3. Using the two hexagonal nuts adjust the distance between the mounting bracket and the ceiling, and keep the mounting bracket on level.

Use explosion screw to fix mounting bracket on ceiling, pay attention to the explosion screw, it can adjust the height, and use level tool to adjust the mounting bracket to reach level.


4. Connecting Circuits


5. According to the chart shows: Raise the showerhead, Aim at the hole of the bolt, plug the bolt.


Use a phillips screwdriver screw out the upper cover 4 screws, open the plastic waterproof boxes.

Note: The same color line docking, brown line for line, blue line is zero line. Use a phillips screwdriver screw out the screws in plastic waterproof box wiring position, then put the fork terminal line connected, then fix it with a phillips screwdriver.






According to the circuit diagram as shown in step 5, then connect plastic waterproof case, please note that the same color of the wire when connecting circuit to docking.


6. Connecting water hoses and Tee joints and then connect the water hoses to the water inlet pipe connector.



7. Connecting 4 pcs water hose to 2 Tee joints and G1/2 joints in the middle and then put another side of the shower hoses through the showerhead side holes.


8. Installing the shower body by plugging the bolts. (As the above picture).


9. Install the decorative panel and twist the corresponding 8 fixing screws with a SW4 hex wrench.


10. Install 4 LED lights and lamp cups clockwise.



11. NOTE: 1. Before connecting water hoses and water pipes, cleaning the water pipes first. It will prevent impurities from clogging the showerhead. 2. When connecting water pipes and hoses ,don't forget putting G1/2 filternet in the water hoses, filtering impurities.

Connect 4 water inlet hoses to the wall-embedded water inlet pipes and then seal the wall.
















Mixer Installation




a. Release Six handwheel levers according to above directions.

b. Take apart the embed valve, panel, and handwheel.


1. Dig the embed space for the pipe on the wall according the specification of the valve.

2. Dig 4 hole according to the position of the screws.


3. Use a hammer to thwack the screws into 4 holes.

4. Fix the valve body with 4 screws.


5. Find out the expansion screw heads with washer and spring washer. Use copper sleeve wrench to lock the screw heads with the embed valve body.

6. After connect all the pipes and before sealing the wall with concrete, confirm no leaking problem occur when turn on water.

7. Fix the decorative panel on the embed valve body.

8. Screw the handwheel arms with the handwheels.






Hand-Held Shower Instructions



5. HOLE LOCATIONS FOR WALL MOUNT

See More ...

Bathroom Fixtures

... Read More