Bravat Light Oil Rubbed Bronze Thermostatic Shower Set With Valve Mixer 2-Way Concealed Wall Mounted
The Bravat Light Oil Rubbed Bronze Shower Set With Thermostatic Valve Mixer -Way Concealed Wall Mounted is one of the most trendiest finishes across decor styles in the bathroom. It has a contemporary style with a beautiful LightOil Rubbed Bronze finish. When it comes to new bathroom upgrades, FontanaShowers is offering shape, finishes and styles that you've looking for.
Unpack and inspect the product for any shipping damages. If you find damages, do not install.
Please note all showers must be installed by a professional and certified plumber otherwise warranty might be voided
shower
Shower Head Installation Instructions
Specifications
Shower
1w
Step 1
Step 2
Step 3
Step 4
Turn water on for 1 minute to flush any debris. Wrap shower arm (H) threads with Teflon tape (I). Install the shower arm (H) into shower outlet through cover plate (J). Then, add a rubber washer (K) and attach shower head (L) to shower arm (H).
Hand-Held Shower Installation Instructions
Step 1
mixer
Step 2
Step 3
Step 4
Step 5
Step 6
1. GATHER ALL PARTS
2. HOLE LOCATIONS FOR WALL MOUNT: Remove Front Cover (A) from Wall Mount (B). Use Wall Mount Screw Holes (C) to place the desired location. Using a punch or awl, tap the screw hole locations.Holes must be vertically aligned.
3. ANCHOR INSTALLATION: Drill two 1/4” dia. Holes (A). If installing into a studs drill two 1/8” dia. holes and do not use Anchors (B). Insert Anchors (B) into Holes (A) and tap flush with the wall.
4. WALL MOUNT INSTALLATION: Place Wall Mount (A) into wall and inset Mounting Screws (B) through Wall Mount Holes (C) and tighten until Wall Mount (A) is flush with the wall. Do Not Over Tighten! Insert Front Cover (D) into Wall Mount (A)
5. DROP ELBOW & HOSE INSTALLATION: Apply PTFE plumbers tape on both ends of Pipe Nipple (A) (not included). Screw Pipe Nipple (A) into the elbow inside the wall.The Pipe Nipple (A) is to project 1/4” – 3/4” from the finished wall. Screw Drop Elbow (B) onto Pipe Nipple (A) and tighten until Drop Elbow (B) is property positioned and flush to the finished wall. Place Rubber Seal (C) inside Hex Hose Fitting (D). Connect Hex Hose Fitting (D) into Drop Elbow Outlet (E) by turning Hex Hose Fitting (D).
6. UNIT STARTUP: Turn on hot and cold water supplies, and check all connections for leaks.
7. FINAL FLUSHING: For final flushing, turn the valve on and allow water to run through the Hose (A) for several minutes.Allow water to run for several minutes until all foreign matter clears the line.
8. SHOWER ARM INSTALLATION: Place Rubber Seal (A) inside Tapered Hose Fitting (B). Conned Hand Shower (C) to Hose (D) by turning Tapered Hose Fitting (B ) clockwise.Warning: Make sure Hand Shower (C) is securely tightened to Hose (D).